Design Process 01
Five different options were considered before the final design was chosen.
“Because of ultra high performance concrete, we were able to work with a wide selection of aesthetic possibilities that would never have been possible with conventional concrete.”Gerry Carson
Design Process 01
Five different options were considered before the final design was chosen.
Design Process 02
Detail showing the design of one of the two main piers supporting the bridge girders.
Design Process 03
To support the span between the two main piers, a set of high strength steel anchor rods are used.
Design Process 04
This rendering depicts the bridge as seen from overhead on the north side of Glenmore Trail.
Design Process 05
Temporary steel towers supported the drop-in girder load allowing the bridge to function as a clear span of 53 metres until the north and south piers were completed.